Check back regularly for updates. We want it to feel as if you are on site with us.
We will give you some pics, videos and updates throughout this process.
Thanks for joining us on this ride!
Rehab Progress
We continue to get great new contract deals for materials.
We are now taking every unit down to the studs. We have a lot of attraction for the new units are they aren't completed.
Things are looking great.
You can be creative with how you summarize your project, trip, or activity here!
We recommend 250 – 325 characters here
Professional Exterior Pics
Had a photoshoot for our completed exterior
More demoed units and starting to hang new drywall. Still running all new plumbing water heaters at the same time. New water line from the main was attached and buried. Ceilings are even demoed into the attic. New insulation and all coming in.
Professional Interior Pics
Had a photo shoot for our completed units. One that had tenants in and one empty.
Here you can show what you learned on a day or highlight a section of your project
We recommend 350 - 400 characters here
Here you can show what you learned on a day or highlight a section of your project
We recommend 350 - 400 characters here
Mud, tape & bathroom tile
Drywall is up in two units and mudded and sanded, all prepped for painting. Tiles are up in the bathroom after replacing backer boards. We will have all but 2 units vacant starting December 1st. WE currently have 10 units demoed and ready for these next steps.
Here you can show what you learned on a day or highlight a section of your project
We recommend 350 - 400 characters here
Add visuals to showcase your finished project or highlights from your trip or activity!
Drywall hung
Removing every single nail. We have one team that is our point of contact through the whole project from here on out. Currently we have 10 units down, while the other 8 are still occupied. We are demoing all of them, but only hanging in top units. We will hang in bottom units if the top unit has been demoed already, just to protect our product if something would happen during the demo process.
Getting prepped for drywall hang
More demoed units and starting to hang new drywall. Still running all new plumbing water heaters at the same time. New water line from the main was attached and buried. Ceilings are even demoed into the attic. New insulation and all coming in.
Demoed second floor & water main line run
More demoed units and starting to hang new drywall. Still running all new plumbing water heaters at the same time. New water line from the main was attached and buried. Ceilings are even demoed into the attic. New insulation and all coming in.
Fully demoed units
Just wanted to keep everyone in the loop. Currently we demoed all flooring from every open unit originally 5 now 6. We are also replumbing all units, starting with our vacant ones.
Demo in some units with initial water drops
Just wanted to keep everyone in the loop. Currently we demoed all flooring from every open unit originally 5 now 6. We are also replumbing all units, starting with our vacant ones.
Original Pics